AGUMEX SYSTEM OPERATING PROCEDURE (SOP)

Warning: The information(s) in each page of this blog is digitally scripted and protected information, which may be hazardous for unauthorized copying or uses into your computer, email or flash. Do not try to copy or use as a spam message or for (in) any criminal activities, offenders shall be exposed and prosecuted by law.
Note: you can only share this information. But for other uses, please contact the owner. http://agumexglobalresources.blogspot.com




 
 
AGUMEX


AGUMEX GLOBAL RESOURCES LIMITED
 

Engineering Digital Wireless Surveillance Security Network Technology, Consultancy Services, Import/Export, Procurement, Logistics, General Commerce, Entertainment & Construction Services.
 

                                                                                                                                                                 CORPORATE/QUALITY ASSURANCE PROFILE


 

PURPOSE, SCOPE, RESPONSIBILITIES MATRIX PURPOSE:
The purpose of this system operating procedure (SOP) on Provisions, Installations, Maintenance of Digital Surveillance Security Network Technology, Distributor/Marketing of Technology Products For Manufacturers, Existing and Intending Manufacture Clients, Such as Spy Body wares products, Fixed access Night/Day vision spy Cameras, Audio/Video Spy Gadgets, Motion Detectors, Bug detectors and all other general goods, products and services Etc., that are not Surveillance Engineering projects, this SOP are to streamline the processes and procedure which AGUMEX GLOBAL RESOURCES LIMITED shall adopt in her business pursuit and execution of projects.
2013(c)



SCOPE
This SOP on project shall cover activities on pursuit of contract, award of contract and manufacturer’s representative authorizations and the execution of the work scopes connected to each business contract.
AGUMEX GLOBAL RESOURCES LIMITED shall also adopt any adhoc measure or methods geared towards delivering her project with no compromise to quality notwithstanding the detailed processes in this SOP.
RESPONSIBILITY MATRIX
The nature of AGUMEX GLOBAL RESOURCES LIMITED activities is designed such that every personnel is relevant to ensuring that
1.     Jobs are won
2.     Jobs won are successfully executed in line with client’s specification.
Personnel responsibility
ü The project director: shall oversee all project of AGUMEX GLOBAL RESOURCES LIMITED
ü Shall ensure that prospective contract are own
ü Shall liaise with the clients on contract related issues
ü Shall approve project documents or nominate personnel approved prior to use
ü Shall report to the managing director on general project performance
ü Shall undertake any other assignment bothering on project
ü Shall receive directives from the managing director
ü Shall be responsible to the project manager
2013(c)

PROJECT MANAGER
Shall be responsible to the project director, the project manager coordinates the activities covered by the execution of the contract and as contractor representative, keeps the appropriate contacts with the clients or its representatives. In particular he is responsible for:
ü Compliance with and fulfillment of the project contractual obligations.
ü Coordination of the activities of the various departments involved in the execution of the job, in order to guarantee conformity with the design criteria, programmes and cost estimates.
ü Implementation of the quality assurance  programs
ü Project detailed programming and the relevant updating together with the various offices involved in the execution of the job.
ü Analysis of the preliminary and final estimates and the definition of possible update relating to the project.
ü Supervision of purchasing, imports/exports goods and services and subcontracts, including other issues expediting inspection and testing activities.
ü Analysis of work or change of the scope of work not covered by the contract, the assessment of the consequent costs and agreement with the client.
ü Shall prepare project execution plan and strategies for smooth execution of the project
ü Shall circulate project scope to various units and shall assemble the input from various units
ü Shall undertake any other responsibility bothering on his project.
2013(c)

CONSTRUCTION MANAGER
ü Shall coordinate mechanical, electrical, telecommunication, instrumentation, civil works, field/system engineers, site supervisor, etc in all construction activities
ü Shall ensure that all construction activities are in line with the client specification without compromise to quality
THE QA/AC MANAGER OR SYSTEM ENGINEER
ü Shall be responsible to the project manager or his designate.
ü Prepare the project QA plan in connection with the project manager and the QA manager at head office.
ü Verity that the quality related activities are in accordance with applicable codes, specifications and regulations.
ü Ensure recording, updating and distribution of documents and information ie procedures, drawing, plans, designs, reports and certificates.
ü Identify any deficiency, promote corrective actions and verity their implementation
ü Verify that contact quality requirements are specified to vendors and subcontractors
ü Ensure surveillance at sub-contractor’s works
ü Ensure that measures are taken in order to identify and prevent acceptance of defective materials
ü Ensure collection of documentation and certificates related to materials purchased by CONTRACTOR and sub-contractors.
ü Prepare QC plans for producing phases and review quality plans issued by sub-contractors and vendors
ü Ensure the inspection and testing in compliance with established QC plans
ü Ensure the compliance of final documentation to be issued to the client
ü Shall prepare quality related documents, processes, plans and procedure and shall ensure their implementations during job execution
ü Shall carry out quality checks and various inspections of AGUMEX GLOBAL RESOURCES LIMITED works and services.
ü Shall ensure that quality assurance records are adapted and controlled
ü Shall carry out any other assignment on quality control and assurance as applicable.
ACCESSMENT CRITERIA (KPI)
Letters of slippage on the scheduled time for a particular project shall not be more than two

To be continued on your request!